Development of Detailed Design Documentation for Project “UI&O Facilities included in C3 Package. Gas Chemical Complex within Ethane-Rich Gas Processing Complex".
Update of Design Engineering Package for Project "Gas Chemical Complex within Ethane-Rich Gas Processing Complex”.
Update of Project Engineering Package “2.160.8 KTPA Kerosene and Diesel Fuel Hydrotreating Unit with Hydroisodewaxing Section and Off-Site Facilities”
Update of Project Engineering Package “Motor Gasoline and Aromatics Production Complex”.
Project Engineering Package Development (ISBL of Combined Diesel Fuel Dewaxing Unit), Yaya Refinery.
Project Engineering Package Development (ISBL of Combined Delayed Coking Unit), Yaya Refinery.
Development of Detailed Design Documentation "Pump and Diesel Fuel Production Complex, Job Nr. 910-135/1,2, LLC “KINEF” (Stage 4).
Update of Project Engineering Package “Oil Refining and Petrochemical Complex, JSC TANEKO". "Light Gasoil Fraction Hydrodearomatization Unit, Job Title 1007 (Section 1503).
Production Process Basis of Design (basic technical solutions) for Diesel Fuel Dewaxing and Hydrotreating Unit (consisting of two sections), Facility 430-10 within Diesel Fuel Dewaxing and Hydrotreating Complex. Start- up Complex 1. Deep Oil Conversion Complex, LLC “Ilsky Refinery” named after A.A. Shamar .
Basis of Design Development for Combined Hydrocracking Unit with 2 571 KTA Hydrogen Production Section.
Development of Project Engineering Package “Construction of Delayed Coking Unit Complex. Delayed Coking Unit. Section 8200 - Feed Processing Package”. Yaya Refinery".
Production Capacities Improvement Roadmap Update, OJSC "Novoshakhtinsky Zavod Nefteproduktov"
Development of Production Process Basis of Design for preparation of the Project and Detailed Design Engineering Packages "LPG Treatment Unit. Area 8300" within the Complex of Facilities: “Construction of Delayed Coking Unit Complex”
Development of Production Process Basis of Design for preparation of the Project and Detailed Design Engineering Packages "Delayed Coking Unit. Area 8100" within the Complex of Facilities: “Construction of Delayed Coking Unit Complex
Development of Production Process Basis of Design for preparation of the Project and Detailed Design Engineering Packages "Hydrogen Production Unit. Area 6100" within the Complex of Facilities: "Construction of Diesel Fuel Dewaxing Complex"
Development of Production Process Basis of Design for preparation of the Project and Detailed Design Engineering Packages "Sulphur Recovery Unit. Areas 7100, 7200, 7300, 7400, 7500, 7700” within the Complex of Facilities: "Construction of Diesel Fuel Dewaxing Complex"
Development of Production Process Basis of Design for preparation of the Project and Detailed Design Engineering Packages "Diesel Fuel Dewaxing Unit" within the Complex of Facilities: "Construction of Diesel Fuel Dewaxing Complex"
Documentation development for "Technical Upgrading of Gas Compression and Processing Units No. 1, 2". Technical Upgrading. Gas Processing Area.
"Gas Treatment Unit as part of Desulfurization and Solidification Unit, UI&O Facilities” for the project “Reconstruction of the Installed Boiler Units TGME-464 of Nizhnekamsk CHPP for the Combustion of Petroleum Coke in the Form of Dust from the Delayed Coking Unit of JSC “TANECO”
Engineering Design Package for "Facility No. 2. Bitumen Unit 19/10. Technical Upgrading with Partial Replacement of Equipment.
Retrofitting with Partial Replacement of Equipment. LCh-35-11/1000.
Design Engineering and Survey Works for Hydrocracker Complex (1-4 stages)
Feasibility Study Services for Petrochemicals Complex Project (final stage)
Facility BTS development - Aromatics Production Complex -2 with Off-Site Facilities. Oil Refineries and Petrochemical Plants Complex, JSC TANEKO".
Technical Upgrading of Production Facility No.4 with decommissioning of Unit L-35-11/600 and tank farm of Unit L-35-11/600
Production Facility No. 47. Feed and Product Department Construction of the a/g oil pipeline for the crude oil tank farms
Combined Straight-Run Naphtha Processing Unit UK-1
Technical auditing for the Project "Modernization of LLC "KNGK-INPZ" including connection of the Refinery to the mains of PJSC "Transneft", reconstruction of the ORF (oil receiving facility), construction of a railway rack, tank farm No. 6, ELOU-AT-6 Unit , 1, 520 TTA MGAPC (Motor Gasoline and Aromatics Production Complex).
Development of Engineering Design for Heaters П-101, П-102, П-103 for Naphtha Hydrotreater AO "Novoshakhtinsky Zavod Nefteproduktov" (NZNP)
Feasibility Study for Production Facility No. 7. Isomerization Unit. Feasibility Study. Installation of package for hydrogen chloride absorption from the crude hydrocarbon flow for stabilizing isomerate to return absorbed chlorine to reaction section Technical Upgrading of Shop No.4 with decommissioning of Unit L-35-11/300 and tank farm of Unit L-35-11/300
Project and Detailed Design Engineering Package, order technical support for "Atm Residue and Naphtha Conversion Facilities"
Development of key FEED sections for the off-site facilities of "Gas Chemical Complex within Ethane-rich Gas Processing Complex"
Project Design Engineering Packages for construction of "Gas Chemical Complex within Ethane-rich Gas Processing Complex". - Ethane Cracking Units Complex - Ethylene Polymerization Units and Linear Alfa Olefins Units - Off-site Facilities,
Project Engineering Package "Construction of Waste Water Treatment Facilities, Process Connection to Utilities at OJSC "Novoshakhtinsky Plant of Oil Products".
Project and Detailed Design Engineering Package for: Advanced Oil Refining Complex (AORC), JSC Gazpromneft-ONPZ
Delayed Coking Unit (DCU) at Omsk Refinery, АО “Gazpromneft-Omsk Refinery”. Detailed Design Package
Engineering design package for "Facility No. 4. Unit LCh-35-11/600 Technical Upgrading with Partial Replacement of Equipment.
Detailed Design Engineering Package for "Pump and Diesel Fuel Production Complex Job No. 910-135/1,2" at KINEF, LLC and assistance in bidding for equipment procurement
Design and survey works including the State Expert review of “Project” Documentation and State Ecological Expert review for construction of the new VGO Heater in Facility No. 01, Heavy Residue Processing Complex
Development of Production Capacities Development Roadmap, OJSC "Novoshakhtinsky Zavod Nefteproduktov"
Complex of oil refining and petrochemical plants. Motor gasoline and individual aromatic hydrocarbons production facilities
Complex of facilities for VR and Naphtha transfer from LLC “Severny Kuzbass Refinery" to Yaya Refinery, affiliate of "JSC "NHS"
Engineering design package for "Facility No. 7. Revamping of Naphtha High Octane Components Production Complex at KINEF, LLC”
“Project” Design Engineering Package for Motor Gasoline and Aromatics Production Complex at LLC “Ilsky Refinery”
Survey and feasibility study of revamping of "Oil Processing Unit ELOU-АТ-800". “Project” and Detailed Design Engineering Packages for Revamping (upgrading) to increase production capacity of Startup Complex V at Anzhersk Refinery". Oil Processing Unit ELOU-AT of 800 KTA crude capacity
Feasibility study for investments into Job No. "Revamping of PSA at JSC “Gazpromneft Omsk Refinery”
“Project” and Detailed Design Engineering Packages for "UK-1 Combined Unit Complex – Straight-Run Naphtha Production Unit and Off-sites at Yaya Refinery"
Detailed Design Engineering Package for CCR Module and catalyst and reduction area piping within Unit UК-1 at Yaya Refinery
“Project” and Detailed Design Engineering Packages for Aromatics Production Complex at JSC “Tatneft”. Detailed Design Engineering Package, including: - Unit 2000 – Interconnecting Networks - Unit 2100 – Catalytic Reformer - Unit 2150 - CCR - Unit 2200 – Xylene Fractionator - Unit 2500 - Sulfolane Extractive Distillation - Unit 2600 - Parex - Unit 2700 - Izomar - Unit 2800 - Tatoray - Unit 2900 – Benzene and Toluene Fractionator - Distribution Transformer Substation 124/39, - Distribution Transformer Substation 124/40, - Distribution Transformer Substation 124/41 with Instrument Room 091/6 - Instrument Room 091/4 - Instrument Room 091/5.
Feasibility Study for MTBE Production Complex at PJSC “Surgutneftegaz”
“Project” Engineering Package for the New Refinery. Detailed Design Engineering Package for Combined Unit 4 (High Octane Gasoline Components Production) of 3.6 MTPA feed capacity, comprising: - Unit 4200 - PSA - Unit 6000 - NHT - Unit 8000 - Isomerization - Units 9000, 9100- CCR Platfromer. Technical assistance services for process equipment, valves and material procurement.
Detailed Design Engineering Package for equipment upgrade of Unit L -24-10/2000 with partial equipment replacement, incl. replacement of Compressors ПК-1, 2 Detailed Design Engineering Package for Liquefied Petroleum Gas Treatment Unit
Feasibility Study for Oil Processing Complex at LLC "Slavyansk EKО" Oil Refining Complex
“Project” Design Engineering Packages for: Catalytic Reformer (Job No. 1011, Units 2102, 2152) "Oil Refineries and Petrochemical Plants Complex" with increased crude hydrocarbons capacity in Nizhnekamsk
Feasibility Study for Washing and Steaming Station Syzran-1 “Revamping for JSC “PGK”
Retrofitting of existing ELOU-AVT Unit, construction of Vacuum Unit
ELOU-AVT-6 Units
Parex-2 Unit
“Project” Engineering Package – Construction Stage 1.2 Naphtha Hydro treatment (Job 007, Unit 1300) Short Flow Sheet.
Revamping with partial replacement of equipment of Crude Distillation Unit with crude desalting ELOU-AT-6. Facility No.1”, Train No.1
“Project” Design Engineering Package for Naphtha and Diesel Pump Stations Complex, Job Nr. 910-135/1,2, "LLC KINEF"Construction stages 1 and 2 Construction stages 3 and 4
“Project” Design Engineering Package for Retrofitting of ELOU-AVT Unit at Yaya Refinery. Detailed Design Engineering Package for Retrofitting of ELOU-AVT Unit at Yaya Refinery.
Gas Drying Adsorber. Gas Treatment Unit No.2, Surgut region, Zapadno-Surgutskoye Field (Overhaul, Reg No.10554640)
“Project” and Detailed Design Engineering packages for 2 MTPA Oil Processing Complex at LLC “Severny Kuzbass Refinery” “Project” and Detailed Design Engineering Packages; Job No.140-10 “Combined Unit LK-2”: Unit 100 – Crude Unit (ELOU-AT), Unit 200 – NHT, including Hydrotreated Feed Fractionation Unit 300 – Reformer Unit 400 – Isomerization Unit 500 – DHT Unit 600 – Sulphur Production, including SWS and MDEA Regeneration. “Project” and Detailed Design Engineering Packages; Job No.430-10 “Combined Unit LK-1M”: Unit 710 – VR Catcracking Unit 720 – Catcracker Naphtha Hydrotreating Unit 730 – LPG DMC Plant.
Feasibility study for construction of Isomerization Unit at LLC “KINEF” Retrofitting of Deep Oil Conversion Complex facilities at LLC “KINEF” Retrofitting with partial replacement of ELOU-AVT-6 Unit equipment
Feasibility study for construction of Aromatic Hydrocarbons Timed Rail Tank Cars Filling Facilities (Job Nr.910-70/2) at LLC “KINEF”
“Project” and Detailed Design Engineering Packages for Gas Fractionator within LK-6Us Unit at JSC “Achinsk Refinery - Eastern Oil Company”, Job “LK-6Us Unit. Retrofitting".
Isomerization Unit
Control Center within Liquid Paraffins Production Unit - PAREX-2. LLC “KINEF”, Facility No.9, Unit Parex-2 Detailed Design Engineering Package for Retrofitting of Diesel and Kerosene Hydrotreating Unit L-24/6 at LLC “KINEF” and assistance in package delivery of equipment and materials Retrofitting of Liquid Paraffins Production Unit - PAREX-2 with DCS Integration and Instrumentation Upgrading Retrofitting with partial replacement of L-24-10/2000 Unit equipment
AGO plus Visbracker Naphtha Hydrodewaxing Unit L-24-10/2000
“Project” Design Engineering Package for the 4th Startup Complex of 2 MTPA Crude Processing Capacity at Severny Kuzbass Refinery.
Upgrading of Deep Oil Conversion Complex at LLC “Ilsky Refinery”. “Project” Design Engineering Package for - Combined Unit LK-2D; - Combined Sulphur Production Unit.
Advanced Oil Refining Complex (GPN)
“Project” and Detailed Design Engineering Packages for construction of High-Octane Naphtha Components Production Complex of 2.3 MTPA Feed Capacity “Project” Design Engineering Package Detailed Design Engineering Package for construction of Combined Unit LK-2B Detailed Design Engineering Package for upgrading networks and utilities of
Detailed Design Engineering Package for upgrading networks and utilities of LLC “KINEF” for new complex connection Assistance in package delivery of equipment.
“Project” and Detailed Design Engineering Packages for Low-Temperature Isomerization Unit Isomalk-2-LIN-800 of 800 KTA Feed Processing Capacity
FEL 2 Package for Atm Resid Catcracking and Hydrotreating processes within 2000 KTA crude processing capacity Complex at Severny Kuzbass Refinery.
Project” Design Engineering Packages for Up-grade of Diesel and Kerosene Hydrotreatment Unit L-24/6 and assistance in package delivery of equipment and materials. FEL 2 Package for Modification of Reactors at LG-24/7 Unit (Train II) and LCh-24-9/2000 targeted at removal of residual sulphur from the commercial diesel. FEL 2 Package for LG-35-8/300B Unit Retrofit.
Declaration of Intent for investments into construction of 10 MTA feed capacity Primorsky Refinery (in Nakhodka town) .
“Project” and Detailed Design Engineering Packages for Deep Oil Conversion Plant, includ-ing Hydrocracking Complex, comprising: 1) Combined Atmospheric Residue Deep Con-version Complex:Unit 1000 – Straight-Run Atm Resid Vacuum Distillation Unit (4.86 MTA); Unit 2000 – Vac. Heavy Resid Hydrocracker (2.93 MTA)Unit 3000 – VTB Visbracker (1.92 MTA);Unit 4000 – Hydrogen Production Unit (155 kNm3/h);Unit 4200 – Hydrogen PSA (35 kNm3/h);Unit 5100 – Waste Water Treatment Facility (275 KTA);Unit 5200 – Sour Water Stripper (369 KTA). 2) Sulphur Recovery Unit including Rich DEA Solution Regenerator. “Project” and Detailed Design engineering packages for Light Oils Timed Rail Tank Cars Filling Facilities.
“Project” and Detailed Design Engineering Packages for Hydrocracker Complex within Deep Oil Conversion Plant at LLC “KINEF”, comprising: Unit 1000 – Straight-Run Atm Resid Vacuum Distillation Unit (4860000 TPA); Unit 2000 - Chevron’s Hydrocracker (2930000 TPA); Unit 3000 - Shell’s Socker- Visbracker (1920000 TPA); Unit 4000 – Hydrogen Production Unit (153,6 Nm3/h); Unit 4200 – H2-Rich Gas Purification Plant (4.33 kNm3/h); Unit 5100 – Waste Water Treatment Facility (275000 TPA);. Unit 5200 – Sour Water Stripper (369000 TPA); Unit 5500 – Amine Regenerator (56000 TPA hydrogen capacity)
Aromatic Hydrocarbons Extractive Distillation Unit based on GTC Process
“Project” Design Engineering Package for the New 12 MTPA Refinery at the site of existing LLC “RN-Tuapse Refinery”, including the following process units: Unit 3000 – Diesel fuel HCR and HT; Unit 4100 – Hydrogen Production; Unit 4200 – PSA; Unit 5000 – DCU; Unit 6000 – NHT; Unit 7100 – SRU; Unit 8000 – Isomerization Unit; Unit 9000, 9100 – Reformer and Off-sites
FEL package. L-35-11/450K Catalytic Reformer HT Capacity Enhancement.Job title: “Catalytic Reformer Modernization. Reg. No. 100027769”.
AGO plus Visbracker Naphtha Hydrodewaxing L-24-10/2000 Unit. Project and Detailed Design Engineering Packages.
“Project” Design Engineering Package for the startup complex of 12 MTPA ELOU-AVT-12 Unit (Site Title 110-10, Units 1000 and 2000) within LLC “RN-Tuapse Refinery”.
Extractive Distillation Area at Mixed Xylenes Production Unit. Detailed Design Package.
Motor Fuel Production Unit. Analysis of equipment performance at expected feed compositions, calculation of peak capacities and TLVs for heavy residues in the Unit feed.
FEED equipment recalculations for enhancement of Oligomerization Unit capacity from 35 TPH (design capacity) up to 40 TPH.
Isom and Reformer feed preparation area integrated NHT Unit 6000. Basic Design Engineering Package.
PFS Package for Construction of new 21 MTA Crude Capacity Complex on the existing Catcracker Unit plot
Changeover of LK-6Us Unit 300/1 2000 TPA capacity to the integrated Diesel Dewaxing and Hydrotreatment process. Basic Design Engineering Package.
Isomerization Unit
Basic Design Engineering Package for ELOU-AVT-12 Unit within the new 12 MTPA Refinery of OJSC "NK Rosneft" at the site of existing PJSC “RN-Tuapse Refinery”
412 KTPA Sour Water Stripping Unit at OJSC “Achinsk Refinery. Eastern Oil Company”. Basic Design Engineering Package Detailed Design Package for Isomerization Unit for: - DIP Unit - 232,5 KTPA; - Feed HT Unit - 203,2 KTPA; - PENEX Unit - 238 KTPA.FEL 2 package for expansion of JSC “Achinsk Refinery. Eastern Oil Company” crude capacity to 9 MTA. FEL 2 package for expansion of JSC “Achinsk Refinery. Eastern Oil Company” crude capacity to 9 MTA.
Basic Design engineering assistance for enhancement of LK-2 Unit 100 capacity.
L-35/3 Unit changeover to PARISOM process.
Integration of Automated Process Control System into PAREX-1 Unit L-24/6 Unit Field Instrumentation and Process Control Hardware Patial Upgrade. Detailed Design Package.
Integration of DCS into LK-6Us ELOU-AT Unit 100 and Field Instrumentation Upgrade.
L-35/5
Transfer of the Reforming Unit to isomerization process L-35-11/300
LP-35-11/40
PFS package for L-24-6 Unit modernization
LG-24/7 Unit Retrofitting and Integration of Automated Process Control System along with Field Instrumentation Upgrade. Detailed Design Package. PFS Package assessing viability of L-35-11/300 Unit upgrade.
Feed HT Isomerization Unit LSI-200. Changeover to HYSOPAR catalyst. JSC “Novokuibyshevsk Refinery”
FEL and FEED design packages for Refinery modernization aimed at improvement of feed processing efficiency.
Capital Improvement and Development Invest-ment Program for LLC “KINEF” up to the year 2015. Feasibility Study of Mixed Xylenes Production Unit Modernization
Modernization Project of LKS-35-64 Unit Reformer Heater P-102.
Automatic Naphtha and Atmospheric Residue Rail Tank Car Loading Facilities. Detailed Design Package. GFU Retrofitting and Automated Process Control System Integration. Detailed Design Package.
Modernization of Unit 300-1 to accommodate LK-6Us Light HCR process
Isomerization Unit
Isomerization Unit
Catalytic Reforming Unit 450 KTPA
Detailed Design Package. L-24-6/1 Unit Changeover to Light Hydrocracking Process. Automated Process Control System Integration, JSC “Kuibyshev Refinery”.
Isomerization Unit
Catalytic Reformer Stabilizer. Detailed Design Package.
L-35-11/450K Integrated Feed HT Naphtha Catalytic Reformer: 560 KTPA – NHT; - 450 KTPA– Reformer. Detailed Design Package.
Changeover of Dealkylation Unit to Medium Temperature Isomerization process (upgrade). Isom Feed Hydrotreatment Unit. Detailed Design Package.
AVT-1 Unit (changeover to Visbreaking process, changeover to Thermal Cracking process)
LK-6U Unit (Unit 300-1 changeover to Hydrodewaxing process).
Modernization of LK-6U, Unit 200
Feed HT Integrated Catalytic Reformer.
Modernization of 7200 TPA Heavy Oils Loading/Unloading Rack. Detailed Design Package
Revamp and Modernization of L-35-11/300 and LCh-35-11/600 Catalytic Reformers
LKS 35-64
LF 35-21/1000
“Detoil” Toluene Dealkylation Unit
“Detoil” Toluene Dealkylation Unit
“Detoil” Toluene Dealkylation Unit
LAB/LABS Production Plant
LCH 24-2000/85
Kerosene and Diesel HT and Sulphur Production Integrated Unit
LCH 35-11/1000
LCH 24-2000
LCH 24-2000
LCH 35-11/1000
LCH 24-2000
LK-6U, LK-6US
LCH 35-11/1000
LK-6U, LK-6US
Mixed Xylenes Production Unit
LCH 24-2000
Aromatics Production Complex
Aromatics Production Complex
LK-6U, LK-6US
Isomerization 132 KTPA
DHT 920 KTPA
Reformer 460 KTPA
NHT 700 KTPA
CDU 3000 KTPA
LCH 24-2000
LCH 35-11/1000
L 35-11/1000
Isomerization 150 KTPA
L 24-9х2RТ
LK-6U, LK-6US
L 35-11/1000
LF 35-11/1000
L 24-9RТ
LCH 35-11/600
LCH 35-11/600
L 35-11/1000
L 24-9
LK-6U, LK-6US
LK-6U, LK-6US
LK-6U, LK-6US
L 35-11/1000
LG 35-11/300-95
Gas Fractionation Unit (GFU)
LCH 35-11/600
L 35-11/1000
L 35-11/1000
LCH 35-11/600
LK-6U, LK-6US
LG 35-8/300Б
LCH 35-11/600
LG 35-8/300Б
LCH-24/7
LG 35-8/300Б
LG 35-8/300Б
L 35-11/600
LG 35-11/300-95
LG 35-11/300-95
LCH-24/7
L 24/7
KHT 220 KTPA
DHT 340 KTPA
Aromatics Extraction 128 KTPA
Reformer 250 KTPA
LCH-24/7
LCH 35-11/600
LG 35-8/300Б
LG 35-8/300Б
LI 150V
LCH 35-11/600
KHT 300 KTPA
DHT 300 KTPA
Reformer 350 KTPA
CDU 2000 KTPA
L 24/7
LCH 35-11/600
LCH 35-11/600
LG-24/7
L 24/7
LG 35-8/300Б
L 35-8/300Б
LG 35-11/300-95
L 35-11/600
LCH-24/7
L 24/7
LCH 35-11/600
LG-24/7
L 24/7
LG 35-11/300-95
LI 150V
LCH -24/7
L 24/7
L 35-9
L 24/6
Centralized Gas Fractionation Unit (CGFU)
Modernization of Pilot Crude Pyrolysis Plant.
L-16-1 Light Hydrocracker.
DHT 1000 KTPA
Xylene Extraction 260 KTPA
Benzene and Toluene Extraction 260 KTPA
Reformer 300 KTPA
LCH -24/7
L 24/7
L 24/7
L 35-9
LG 35-11/300
L-24/8
L 35-8/300Б
L 24-300
L 35-11/300
L 35-11/300
Reformer 300 KTPA
LG 35-11/300
L 35-11/600
Reformer 300 KTPA
LG 35-11/300
L 24/7
LG 35-11/300
L 24/7
L 24/6
L 24-300
L 24/7
L 24/6
L 35-11/600
Benzene Extraction Reformer 300 KTPA
L 35-11/300
L 24-300
L 24/7
L 35-11/300
LG 35-11/300
14000 TPA MEK Production Unit. Butylene Sulfuric Hydration Process based.
L 35-6
L 35-11/600
L 35-11/600
L 35-11/300
L 35-11/300
L 35-11/300
HTU 116 KTPA
Reformer 70 KTPA
L 24/6
L 35-11/300
L 24/6
L 24-300
L 24/6
L 24-300
L 24-300
L 35-6
L 35-6
L 24-300
L 35-11/300
L 24/6
L 24-300
L 35-11/300
L 24-300
L 24-300
L 35-11/300
L 35-11/300
L 35-6
L 35-11/300
L 35-6
L 35-11/300
L 24/6
L 24/6
L 35-6
L 24/6
L 35-11/300
L 24/6
L 35-6
L 35-11/300
Reformer 300 KTPA
L 24/6
L 24-300
L 35-6
L 35-11/300
L 24-5
L 35-5
L 24/6
L 35-11/300
L 35-5
L 35-11/300
L 35-11/300
L 35-6
L 35-5
DHT 500 KTPA
DHT 300 KTPA
Reformer 300 KTPA
L 35-6
L 35-5
L 35-6
L 24-5
L 35-5